DEVELOPMENT OF MOND, KAKI AND BUSHGAN OIL FIELDS
Project activities in three fields (Mond, Kaki and Bushgan):
- Three-dimensional seismic operations as well as the seismic lateral SVSL Mond and repair operations completed drilling well No. 6 and No. 8 Mond field verification layer 's upper and lower layers Sarvak Mond.
- Design and installation of the pumps heavy oil well (pump (PCP doing successful test operation of the pump in Well No. 6 and 8 field Mond.
- South Road Mond field length 22/5 km and a width of 7 meters.
- Prepare a comprehensive plan to develop three fields (Mond, Kaki and Bushgan).
- Signature HOA between Inter Naft Gas Prom Pars Company (INGP) and National Iranian Oil Company (NIOC) for the three fields (Mond,kaki and Bushgan).
- Check out the technical / Legal and Finance negotiations,(Service Contract) to develop three fields with National Iranian Oil Company (NIOC).
Project activities planned three fields (Mond, Kaki and Bushgan):
- Sort of an early production of 7000 barrels / day after 38 months from the effective date of the contract.
- First phase production rate of 10,000 barrels / day after 49 months from the effective date of the contract.
- Increased production of early phase sort 14,000 barrels / day after 58 months from the date of contract.
- The second phase to produce 26 thousand barrels / day after 77 months from the date of contract.
Contractors:
Inter Naft Gas Prom Pars Company (INGP) - to develop and integrate the three fields method Buy Back.
Geographical location of the project:
Mond: is located 80 kilometers southeast of Bushehr.
Kaki: Located 80 kilometers southeast of Bushehr, 15 kilometers south of the North East Mond is Khormoj.
Bushgan: Located about 100 km south-west of Shiraz and is 100 km from Bushehr.
DEVELOPMENT OF ZAGEH OIL FIELD
Contractors:
INTER NAFT GAS PROM PARS COMPANY (INGP).
Geographical location of the project:
Slums: 6 km north of the coast of the Persian Gulf, 30 km southeast of Port Deilam under the edge of the Rag Sefid Oil Field.
Heavy oil field activities in slum:
- Implementation of three-dimensional seismic survey vessel, together with the Rag Sefid Oil Field.
- Harvest operations, data processing and data interpretation.
- PSTM and PSDM processing operations.
- Signature HOA between Inter Naft Gas Prom Pars Company (INGP) and National Iranian Oil Company (NIOC) for the evaluation phase field method slum EPCF.
- Improvement of about 40% in the preparation and construction of access roads and drilling well No. 2 Camp Slums.
Heavy oil field activities planned in slums:
The assessment phase include:
- Conducting negotiations for finalizing the assessment phase contract between Inter Naft Gas Prom Pars Company (INGP) and National Iranian Oil Company (NIOC) method EPCF.
- Completion of the construction of access roads to well # -2 slums.
- Drilling wells for collecting the data, and finally 2: Slums of production wells Pabdeh or Sarvak.
- Construction of the process plant and pipeline to transport oil from wellhead production wells to start production from the field of operation.
- Preparation of a comprehensive development plan (MDP) after data collection and study of static and dynamic.