Salman-Sirri Project

The Petroleum Engineering & Development Company (PEDEC) on behalf of National Iranian Oil Company intends to transfer produced gas from KPP Platform in SALMAN field is Located some 144 km South of Lavan Island in Iranian waters of the Persian Gulf to the onshore facilities at SIRRI Island by 30'' Submarine gas transmission pipeline.

 

PEDEC has awarded the mentioned EPCF project to the Consortium of Iran Naft Gas Prom Pars (INGP), Inter Gas Prom (INGP Ukraine), Institute of Oil Transportartation, JSC (IOT).

 

The contract comprises the Detailed Engineering, Material Procurement, Fabrication and Installation of Pipe line which include route Survey, near shore Trenching, Shore pulling, Free span correction, Crossovers, Spool pieces, Tie ins, Hydro testing and Pre commissioning activities. The engineering design covers the basic and detailed design for one 30'' lines submarine pipeline together with their associatedexpansion system.

 

The engineering scope of work comprises Basic Design, Detail Design and Project Specification. Based on these documents the fabrication and installation will be performed under supervision by highly qualified Project QC team in accordance with international codes and standards and project specifications.